Spring Start Up and Winterization Instructions for Krupske
Sprinkler Systems installed in 2011 or after
Spring Start Up Instructions
RPZ valve correctly installed. Notice
test ports are on top.
Step 1 Reinstall the RPZ valve outside and open the
valves that were left at 45 degrees. Step 2 Close the drains that were opened for winter. Step 3 Turn the main water valve on. Step 4 Check each zone and make
sure all the sprinkler heads are spraying correctly. Step 5 Call us for the annual RPZ certification
as required by law.
Winterization Instructions
Winterized - Notice the Handles
at a 45 Degree Angle
|